Dry excavation works at Sokhna Port
As a sub-contractor for CHINA HARBOUR for: Executing of dry excavation works up to (-17 m) level for approximate qty. 3,900,000+ cubic meter for basin at Port of Sokhna, Container Terminal Basin 2 project. Work includes shifting of the excavated material out of site to the designated areas inside and outside Sokhna Port.